ABSTRACT


Dodge’s type I continuous sampling plan (CSP-1 plan) can be used for the process control. Both the maximum value of the average outgoing quality (AOQ) and the average fraction inspected (AFI) are the indices to measure the performance of the plan. Short-run or low-volume production refers to processes that generate only a small number of items at any one time. This paper presents how to calculate the average outgoing quality limit (AOQL) for short-run CSP-1 plan based on numerical method. We further modify Wang and Chen’s formulae and adopt the conventional Newton’s method for finding the approximate AOQL for CSP-1 plan with specified production run length.


Keywords: Type I Continuous Sampling Plan (CSP-1 Plan); Average Outgoing Quality (AOQ); Average Outgoing Quality Limit (AOQL); Average Fraction Inspected (AFI); Short-Run Production


REFERENCES


  1. [1] Dodge, H. F., “A Sampling Inspection Plan for Continuous Production,” Annals of Mathematical Statistics, Vol. 14, pp. 264279 (1943); Dodge, H. F. and Torrey, M. N., “Additional Continuous Sampling Inspection Plans,” Industrial Quality Control, Vol. 7, pp. 712 (1951).
  2. [2] Blackwell, M. T. R., “The Effect of Short Production Runs on CSP-1,” Technometrics, Vol. 19, pp. 259263 (1977).
  3. [3] Yang, G. L., “A Renewal-process Approach to Continuous Sampling plans,” Technometrics, Vol. 25, pp. 5967 (1983).
  4. [4] McShane, L. M. and Turnbull, B. W., “Probability Limits on Outgoing Quality for Continuous Sampling Plans,” Technometrics, Vol. 33, pp. 393404 (1991).
  5. [5] McShane, L. M. and Turnbull, B. W., “New Performance Measures for Continuous Sampling Plans Applied to Finite Production runs,” Journal of Quality Technology, Vol. 24, pp. 153161 (1992).
  6. [6] Liu, M. C. and Aldag, L., “Computerized Continuous Sampling Plans with Finite Production,” Computers and Industrial Engineering, Vol. 25, pp. 445448 (1993).
  7. [7] Wang, R. C. and Chen, C. H., “Minimum Average Fraction Inspected for Short-run CSP-1 plan,” Journal of Applied Statistics, Vol. 25, pp. 733738 (1998).
  8. [8] Hornbeck, R. W., Numerical Methods, Prentice-Hall, Inc., Englewood Cliffs, NJ, U.S.A. p. 66 (1972).